Notes |
|
1. Background Information
Please describe as concisely as possible the general outlines of the project for which the equipment is required, indicating whether the latter is (a) for use by an expert in the performance of his duties (b) for a training scheme of institution or (c) for a research institution. If either (b) or (c) please say whether the equipment is for the estableshment of a new institution or the expansion or re-organization of an existing one (e.g., by the provision of a new department, etc.). The name and exact location of the institution, its approximate cost and the authority responsible for it should be stated. Where appropriate details should be given of the availability of any services required for the operation of the equipment. This would include operation by electricity (i.e. type of current, periodicity, voltage and any variations, phases, frequency etc. and if D.C. is the only current available please give full details), water reticulation or steam gas etc. Details of similar equipment already in use should be given. |
Support NCERD Working Team in
One of measures to be taken by the Japanese side is provision of machinery and equipment. The list of equipment requested by the Egyptian side is shown in Annex. |
2. Description of equipment required
Please give a full description of each item and general specifications where possible. The manufacturer and estimated cost of each item if known together with details of the proposed end use of item should be given. Where applicable, give details of any special packing or tropic proofing required and indicate whether handbooks or instruction data supplied in English will suffice. If apppropriate, please indicate any required priorities or phasing of deliveries and advise whether adequate facilities exist for maintenance and servicing of the type of equipment requested. (If lengthy, detailed lists should be annexed; it would be convenient to have separate annexures for (a) films; (b) books and (c) other equipment.) | Under the scope of the technical cooperation, the Project activities will be carried out mainly in the following areas:
The list of equipment required by the Egyptian side is as follows: |
3. Has this equipment request already been directed to any other Agency or country and if so to whom was it addressed and with what result? | No |
4. Has the list of equipment already been discussed with representatives of the supplying country/ies? If so, please indicate what stage the discussions have reached. | The list of equipment has been discussed with JICA Experts and JICA Representatives. |
5. Furnish full particulars in respect of -
| . |
6. Where equipment is required for use by an expert
Please indicate -
|
|
7. Where equipment is required for Training of Research Institutions
Please indicate -
| . |
8. Correspondence
Name, Postal and Telegraphic Address of official to whom correspondence regarding this proposal is to be forwarded | Dr. Nadia Y. Gamal El-Din National Center of Education Research and Development Silver-Tower 14F, El-Alfy, 12, Waked St., Cairo, Egypt Tel: (202)5890982, Fax: (202)5938788 |
Signed _______________________ | |
on behalf of the Government of Arab Republic of Egypt | |
Date: ___________________ |
Dr. Nadia Y. Gamal El-Din National Center of Education Research and Development |
| |
For use only by Donor Government | |
Proposal accepted/rejected/withdrawn | |
on behalf of the Department of ___________________ | |
Date: ___________________ |